This state publishes an official property-transfer inspection form that inspectors must complete and deliver.
What Arizona requires at property transfer
- When an inspection is triggered
- Transfer of ownership of a property served by an on-site wastewater treatment facility.
- Scope
- Statewide transfer-of-ownership inspection of on-site wastewater treatment facilities.
- Inspector credentials
- Inspection must be performed by a qualified inspector as defined by ADEQ.
- Report validity period
- Inspection must be performed within 6 months before the transfer of ownership.
- Pumping requirement
- Verify pumping/tank-access requirements with ADEQ and the delegated county.
- Failure and repair rules
- Deficiencies found at inspection are disclosed on the Report of Inspection; corrective work follows ADEQ / delegated county requirements.
- Exemptions
- Verify exemptions with ADEQ or the delegated county.
How the report is filed
- Submission method
- Buyer submits the Notice of Transfer to ADEQ or the delegated county within 15 days of the transfer of ownership.
- Who receives the report
- Seller gives the completed Report of Inspection to the buyer at or before transfer. The Report of Inspection is NOT filed with ADEQ or the county.
- Copies required
- Buyer copy required · Seller copy required · Government filing required
- Local jurisdiction involvement
- County or municipal rules can add requirements on top of the state rule. Confirm with the approving authority.
- Local notes
- Many Arizona counties are delegated to administer the program locally.
Official Arizona forms
Report of Inspection — On-Site Wastewater Treatment Facility (GWS 432)
Revision Revised April 22, 2021
Open the official formReport of Inspection — On-Site Wastewater Treatment Facility
Open formNotice of Transfer — On-Site Wastewater Treatment Facility
Open form
Filing checklist for inspectors
- 1. Confirm the governing authority. Primary source: Arizona Department of Environmental Quality (ADEQ).
- 2. Use the correct form. File on the official state form when one exists; otherwise use the form the local approving authority accepts.
- 3. Document the system. Tank, distribution, drainfield and dated photos, captured in the field so the report is complete on site.
- 4. Sign and certify. Include the inspector name, license number and title on the certification line.
- 5. Deliver and retain. Send the report to every required recipient and keep your copy per state record-keeping rules.
File Arizona reports faster with Septic Pro Connect
Capture the inspection on your phone and the platform fills the official form, builds the photo appendix and attaches the public property record — in the order agencies expect.
Regulatory requirements change and may vary by local jurisdiction. Verify current requirements with the applicable state/local authority. Septic Pro Connect does not provide legal advice. Library entry last verified 08/17/2026.